Warning: Declaration of Graphene_Description_Walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/j1simon/public_html/stickneyconstruction/wp-content/themes/graphene/includes/theme-menu.php on line 49

Warning: Declaration of Graphene_Walker_Page::start_el(&$output, $page, $depth, $args, $current_page = 0) should be compatible with Walker_Page::start_el(&$output, $page, $depth = 0, $args = Array, $current_page = 0) in /home/j1simon/public_html/stickneyconstruction/wp-content/themes/graphene/includes/theme-menu.php on line 142
Whole Home Remodel, Naples Florida | Stickney Construction

↑ Return to Work Examples

Whole Home Remodel, Naples Florida

This house was in need of many updates.   After demolition, we assembled all of the cabinets and installed them.  Many of the installation was custom.  We installed Travertine tiles throughout the entire house, installed new trim and light fixtures.  The bathroom vanities were updated and new counter tops in kitchen and bathrooms installed.  Virtually everything in the house is updated after our work.

Picture 14 of 17